US Zen Institute Construction Progress

Construction is progressing smoothly with the US Zen Institute Relics Addition thanks to close collaboration between the contractor and architect.

USZI 05_b.jpg

April 29, 2026

A temporary wood tower was built in the center of the octagon to build the roof.

USZI 05_a.jpg

May 22, 2026

View from lower level up into the main roof structure.

USZI 05_b.jpg

May 22, 2026

Ground face block facade partially installed with bond beams over future interior doors and windows.  Exterior stud and plywood walls have been erected on main structure and roofing underlayment has been installed.  

USZI 2026 01a.jpg

January 31, 2026

Starting the footings and foundation of the Relics Addition during extremely cold weather was a challenge that was met by Hubert Construction and their concrete subcontractor..

USZI 2026 03.jpg

February 27, 2026

CMU block and reinforced concrete foundation walls along with the reinforced concrete slab were installed after the footings passed inspection.  Sub-grade foundation drains and waterproofing were installed.

USZI 2026 04.jpg

April 2, 2026

Steel frame has been erected and all welds inspected.  Framing starts next.